Fast-Ship Options

Powder Coated Steel

Powder Coated Steel (12 color that ship in 2 days)
In the headrail braced style, our bathroom stalls ship in 2 days with 12 colors to choose from. Floor mounted and ceiling hung; 108″ and smaller also have 12 colors but ship in 5 days. The remaining styles and colors ship in 2.5 weeks.

High Pressure Laminate

High Pressure Laminate (30 colors ship in 2 days)
All high pressure laminate bathroom partitions have a 2 day lead time. please see our Bobrick HPL color chart for the complete list of 30 colors.

HDPE Solid Plastic

HDPE Solid Plastic (41 colors ship in 5 days)
We have 41 colors in Solid Plastic that can ship in 5 working days. Please see both of our solid plastic color charts for a complete list.

Stainless Steel

Stainless Steel (Brushed and Embossed finishes ship in 2 days)
Headrail braced; #4 brushed and Embossed stainless steel restroom partitions have a lead time of 2 days, for up to 30 units. Floor and ceiling hung are availble in 5 days. Stainless Steel toilet stalls are 100% recyclable.

Solid Core Phenolic

Solid Core Phenolic (18 colors ship in 10 days)
All Solid Phenolic restroom stalls have a 10 day lead time. There are 18 colors to choose from. Please see our Bobrick color chart for the complete list.

Reinforced Composite (SCRC)

Reinforced Composite (SCRC) (4 colors ship in 10 days)
All SierraSeries restroom stalls on our website have a 10 day lead time. SierraSeries comes in four colors; Golden Khaki, Desert Beige, Terra Cotta, & Forest Green.